top of page
0-02-06-ea7d06c887deec157edb378b86334d2e8c40e28d3dddafa59fb63de4dbc47646_61e5e6bca574ae21.

HORIZONTAL DIRECTIONAL DRILLING

A construction technique whereby a tunnel is drilled under a waterway or other designated area, and a pipeline or other utility is pulled through the drilled underground tunnel.

84087604_766773577166245_398063140424856

MMDA CCTV AWIN PROJECT

10 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

83119225_766773147166288_3149448425225846784_n.jpg

MMDA CCTV AWIN PROJECT

10 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

81520125_766773177166285_4894051328973602816_n.jpg

MMDA CCTV AWIN PROJECT

10 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

IMG-1cacfb5c1214f4622786f3d2dadbc29d-V.jpg

FIBERHOME PLDT PNR N2

2 TO 6 RUNS 118mm HDPE PIPE UNDERGROUND INSTALLATION

IMG-edb2abb447f4dcb3955dc3315431709e-V.jpg

FIBERHOME PLDT PNR N2

2 TO 6 RUNS 118mm HDPE PIPE UNDERGROUND INSTALLATION

received_847053929517654.jpeg

FIBERHOME PLDT PNR N2

2 TO 6 RUNS 118mm HDPE PIPE UNDERGROUND INSTALLATION

0-02-06-71295cb9d6e31bd751927bd2e88fe9902fea655db0a1cd630e7c2f11011d6604_593d0cee89b77fc8.

EASTERN DSCH BMH TO POI ILIJAN LC PROJECT

2 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

0-02-06-b34b1eeabd2f563172248843642fd875337f870388bb75f43940238a2621576b_52ea1b7d74ddf80f.

EASTERN DSCH BMH TO POI ILIJAN LC PROJECT

2 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

0-02-06-b34b1eeabd2f563172248843642fd875337f870388bb75f43940238a2621576b_52ea1b7d74ddf80f.

EASTERN DSCH BMH TO POI ILIJAN LC PROJECT

2 RUNS 50mm HDPE PIPE UNDERGROUND INSTALLATION

0-02-06-2d2341c1e65db4d2ec42ace11ceeb6b0991bc1896c02a41e412dadf93e4918e3_7e528c0e215594d6.

CONVERGE PNR SOUTH COMMUTER PROJECT

2 RUNS 7 WAY MICRODUCT UNDERGROUND INSTALLATION

0-02-06-ec391d7ee3e2a3969914de5e605bbecac21e1a40c8f6ebd337c9a6fe5b9c8fb4_3c53dc7af3edb645.

CONVERGE PNR SOUTH COMMUTER PROJECT

2 RUNS 7 WAY MICRODUCT UNDERGROUND INSTALLATION

0-02-06-545d058baf9417ecafc81d4903a9dab01c442f1f8c8c4d62fb1467dcbb099340_839e49c4af36883c.

CONVERGE PNR SOUTH COMMUTER PROJECT

2 RUNS 7 WAY MICRODUCT UNDERGROUND INSTALLATION

Business Address:

Unit 309 38 A.N.Y Building Timog Ave Brgy Laging Handa Quezon City

 

14TH Flr Netcube Centre 3rd Avenue Corner 30th St. E Square Cresent Park, West Bonifacio Global City Taguig, Manila Philippines
 
Website: www.rlinkcorp.com

Tel.       0270030725
Mobile: 09190823517

Connect with us

on your favorite social networks

  • Facebook

DISCLAIMER NOTICE!

RLINKCORP.PH CORPORATION

is not related to

RLINK Business Solutions Inc

© 2019 copyrighted by: rlinkcorp.com

bottom of page